Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
project_tracking [2017/01/05 16:28] – created alanproject_tracking [2017/01/23 17:48] (current) alan
Line 2: Line 2:
   - 12-30-16 Initial planning meeting 1 hour   - 12-30-16 Initial planning meeting 1 hour
   - 1-5-17 Set up test pinet server on VMWare server, SLCHC County 1 hour actual. Setup ran for additional time thereafter.   - 1-5-17 Set up test pinet server on VMWare server, SLCHC County 1 hour actual. Setup ran for additional time thereafter.
 +  - 1-13-17 Finish setting up the server. Total time, .75 hours. //Gotcha one//. Pinet assumes a physical server WITH an SD card reader. working on resolving this in my virtual test bed. Will require a virtual server to act like a physical server moving forward. //Gotacha two//. Pinet is command line controlled. Will need a series of documents on this. 
 +  - 1-23-17 Installed Tight VNC. This will allow command line access outside of VMWare. TightVNC is installed and working to a GUI.