User Tools

Site Tools


project_tracking

This is an old revision of the document!


Project Tracking

  1. 12-30-16 Initial planning meeting 1 hour
  2. 1-5-17 Set up test pinet server on VMWare server, SLCHC County 1 hour actual. Setup ran for additional time thereafter.
  3. 1-13-17 Finish setting up the server. Total time, .75 hours. Gotcha one. Pinet assumes a physical server WITH an SD card reader. working on resolving this in my virtual test bed. Will require a virtual server to act like a physical server moving forward. Gotacha two. Pinet is command line controlled. Will need a series of documents on this.
project_tracking.1749272338.txt.gz · Last modified: 2025/06/06 21:58 by 47.128.41.229